Data centre
Intel has achieved surprising results using an 'air economiser' in a test data centre

Intel study shows data centres need not be cool

Experiment sees power consumption cut by 67 per cent

Iain Thomson in San Francisco

A pilot study on data centre cooling has shown that systems architects may be over-specifying data centre operations.

Intel set up a trial data centre (PDF) of 900 blade servers split into two sections. One side was run in the traditional manner, with air-conditioners and dust filters, and the other used an air economiser which simply sucked out hot air and replaced it with outside air at normal temperature without adjusting for temperature or humidity.

Advertisement

The results were surprising. The unfiltered, un-cooled data centre machines suffered a failure rate of 4.46 per cent, compared to 3.83 per cent for the air conditioned centre, despite having an internal air temperature of around 90 degrees Fahrenheit.

Air in the un-cooled centre was passed through simple household dust filters. The servers became covered with a thick layer of dust over the 10-month trial period but this did not seem to affect reliability.

If the results are extrapolated to a 10-megawatt data centre, Intel estimates that it could cut power consumption by 67 per cent, yielding a cost saving of $2.87m per annum.

"A data centre equipped with an air economiser could substantially reduce Intel's environmental footprint by reducing consumption of power and water," said Don Atwood, regional data centre manager at Intel Information Technology.

"In dry climates, traditional air-conditioned data centres typically include evaporative cooling using water towers as a pre-cooling stage.

"With an economiser, this would not typically be used, potentially saving up to 76 million gallons of water annually in a 10-megawatt data centre."

The test centre was set up in a dry, temperate desert and the results suggest that data centres are capable of operating perfectly well at temperatures approaching 90 degrees Fahrenheit and using much less expensive air conditioning equipment.

The company is now planning on building a 1-megawatt test facility and conducting a longer trial to get a more accurate picture of reliability rates.

  • Have your say
  • Send to a friend
  • Print
  • Digg
  • Reddit
  • Share

Do you agree?

Further reading

Lehman Brothers

Lehman's value mainly in data centres

Barclays values data highly

VMware logo

VMware announces universal clients

Partnership with Cisco will secure clients

Server shipments buck economic downturn

HP sets the pace, while Dell expands market share

HP ships millionth blade

On the cutting edge

Related whitepapers

Related jobs

Most watched

iPhone

Video Review: iPhone 3GS

We put Apple's latest iPhone through its paces

Xperia X1

Video Review: Sony Ericsson Xperia X1

First Looks Editor Ian Williams gets hands on with the Sony Ericsson Xperia X1

IT white papers

Search white papers

Top categories

Poll

Poll: Summer smartphones

Poll: Summer smartphones

Which smartphone will you be taking to the beach this summer?

View poll results

Advertisement

Advertisement

Newsletter signup

Sign up for our range of FREE newsletters:

Existing User

Newsletter user login:

Enter email address to edit your newsletter preferences

Job of the week

Search thousands of IT jobs :

Search thousands of IT jobs:

Advanced search

Hiring now on ComputingCareers:

Related IT jobs

Search thousands of IT jobs :

Search thousands of IT jobs:

Advanced search

Spotlight

iPhone

Video Review: iPhone 3GS

We put Apple's latest iPhone through its paces

old computer

Government honours veterans of Bletchley Park at last

Surviving veterans of the code-breaking facility to receive badge of...

Motorola MC55 Enterprise Digital Assistant

Review: Motorola MC55 Enterprise Digital Assistant

A rugged Windows Mobile device for mobile workers

BT

BT promises 1.5m fibre connections by summer 2010

Telco begins major rollout in 69 locations across the UK

Primary Navigation