A pilot study on data centre cooling has shown that systems architects may be
over-specifying data centre operations.
Intel set up a
trial
data centre (PDF) of 900 blade servers split into two sections. One side was
run in the traditional manner, with air-conditioners and dust filters, and the
other used an air economiser which simply sucked out hot air and replaced it
with outside air at normal temperature without adjusting for temperature or
humidity.
The results were surprising. The unfiltered, un-cooled data centre machines
suffered a failure rate of 4.46 per cent, compared to 3.83 per cent for the air
conditioned centre, despite having an internal air temperature of around 90
degrees Fahrenheit.
Air in the un-cooled centre was passed through simple household dust filters.
The servers became covered with a thick layer of dust over the 10-month trial
period but this did not seem to affect reliability.
If the results are extrapolated to a 10-megawatt data centre, Intel estimates
that it could cut power consumption by 67 per cent, yielding a cost saving of
$2.87m per annum.
"A data centre equipped with an air economiser could substantially reduce
Intel's environmental footprint by reducing consumption of power and water,"
said Don Atwood, regional data centre manager at Intel Information Technology.
"In dry climates, traditional air-conditioned data centres typically include
evaporative cooling using water towers as a pre-cooling stage.
"With an economiser, this would not typically be used, potentially saving up
to 76 million gallons of water annually in a 10-megawatt data centre."
The test centre was set up in a dry, temperate desert and the results suggest
that data centres are capable of operating perfectly well at temperatures
approaching 90 degrees Fahrenheit and using much less expensive air conditioning
equipment.
The company is now planning on building a 1-megawatt test facility and
conducting a longer trial to get a more accurate picture of reliability rates.
Do you agree?
Have your say on this article