All the latest UK technology news, reviews and analysis

Samsung puts memory on a diet

by William Eazel

13 Apr 2006

Be the first to comment

  • Tweet this

Samsung Electronics today announced that it has developed a small-footprint memory technology through a technique which reduces the size of a stacked set of semiconductors.

Samsung’s wafer-level processed stack package (WSP) of high density memory chips was created using 'through silicon via' (TSV) interconnection technology. WSP actually reduces the physical size of a stacked set of semiconductor chips, while greatly improving overall performance.

Samsung said WSP is widely seen as the next generation in package technologies, and can be applied to all types of hybrid packages, including memory and processors, to deliver higher speed and higher density with minimum use of chip space.

Using this technology, mobile device and consumer electronics manufacturers will gain better electrical performance, well suited for slimmer, high-performance handset designs that provide longer battery time.

Samsung's first WSP is a 16Gb memory solution that stacks eight 2Gb NAND chips. The WSP generates a much smaller multi-chip package (MCP), which is the current mainstream solution for designing miniaturized, high-capacity memory devices. Samsung's eight-chip WSP prototype sample, which vertically stacks eight 50-micrometer, 2Gb NAND flash die, is 0.56 millimeters in height.

The chips in today's MCPs are connected by wire bonding, which requires vertical gaps between dies that are tens of microns wide and horizontal spaces on the package board that are hundreds of microns wide to accommodate the wire connections.

By contrast, WSP forms micron-sized holes that penetrate through the silicon vertically to connect circuits directly, eliminating the need for gaps of extra space and wires protruding beyond the sides of the die. Due to these adv antages, WSP has a 15-per cent smaller footprint and is 30 per cent thinner than an equivalent wire-bonded MCP solution.

Do you agree?

 

Add your comment

We won't publish your address
By submitting a comment you agree to abide by our Terms & Conditions. Your comment will be moderated before publication.

Poll

IT priorities for 2012

What is the most important IT priority for your company this year?

99%

0%

1%

0%

0%

Connect with V3.co.uk

Sign up to our daily or weekly newsletters

Accurev

Top 5 software development challenges

This paper focuses on a series of best practices and techniques for development teams looking to improve their software development processes

Talend

Rubbish in, rubbish enterprise

Why good data management at all levels is essential in the modern business (video, 6mins)

Salesforce.com Tech/Func Consultants, £50-70K + Bens, UK

Salesforce.com Consultants, both Functional or Technical...

Enterprise Data Architect - £95k

Enterprise Data Architect required by reputable Banking...

BI Developer / Data warehousing Developer - SSAS, SSRS

SSIS, SSAS, MDX, OLAP, OLTP, Data Warehousing, Data Modelling...

Senior Network Engineer

Specialist IT service provider is looking to recruit...

To send to more than one email address, simply separate each address with a comma.